We are designing systems of deep cooling of water based on the technology which uses pro-ecologic water solution of lithium bromide as the circulating liquid. We provide technological solutions for industrial systems of biomass combustion. We also prepare complete engineering specification of pneumatic conveying systems.
2007
  • The executive project modernization installation transport of the lime.
2004
  • Documentation of water conditioning installation in turbine cooling system in Mielec Heat and Power Plant
2003
  • Technological documentation of automatic coal sampling installation in ¯erañ Heat and Power Plant
2002
  • Power unit exploitation manual in Rybnik Power Plant
  • Basic Project. Adaptation of WW-2 coal tippler in Opole Power Plant
  • UDT (Technical Supervision Office) acceptance documentation of sliding beams in the engine room in Rybnik Power Plant
2001
  • Heating system exploitation manual in Rybnik Power Plant
2000
  • Inventory and technological scheme of compressed air installation for all machines and fittings in Rybnik Power Plant
  • Installation of a system of volatile ashes industrial usage in Chwa³owice Coal Mine
1999
  • Constructional and Executive Project. Paint shop, wash and electric engines dryer in Electric Shop section in Rybnik Power Plant
1998
  • Basic Technological Project. Installation of lime stone production system in Rybnik Power Plant
  • Feasibility study of Flue Gas Desulphurization in Rybnik Power Plant
  • Lime stone installation in Rybnik Power Plant
1997
  • Feasibility study of gas turbine installation in Rybnik Power Plant
  • Analysis of location possibility and preliminary design of a 370MW gas-steam turbine cooling system in Rybnik Power Plant