Structural engineering
We prepare engineering specification of steel constructions together with three-dimensional models. The reinforced concrete structures are designed by engineers who have access to the best software available on the market.
2003
  • Executive Project. Exchange and silencing of housing of the central Pumping Station in Rybnik Power Plant – stage 2.
2002
  • Execution Project. Repair of the facade of an output shaft no. 1 in Pniówek Coal Mine.
  • Constructional Project. Ash holding container with capacity of 600m³ in Chwa³owice Coal Mine KWK
  • Executive Project. Spray drying room.
  • Executive Project. Renovation of steel retaining construction of ash holding container with capacity of 4x2000m³ in Rybnik Power Plant
2001
  • Acoustic wall insulation in the engine room in Rybnik Power Plant
  • Supporting construction of areals and relay station for cell telephony network in Rudniki Cement Mill
  • Constructional and Executive Project. Coal storing site in Debiensko Heat and Power Plant
  • Executive Project. Exchange and silencing of housing of the central Pumping Station in Rybnik Power Plant – stage 1.
  • Constructional Project. Technical gases warehouse.
  • Evaluation of technical condition and preparation of renovation project of coke extinguishing tower no. 3 in ZK Zdzieszowice
2000
  • Constructional and Executive Project. System of boiler coaling in Dêbieñsko PE “MEGAWAT” – Plant Z 1
1999
  • Constructional and Executive Project. Tennis hall for „Energetyk” Club in Rybnik
1998
  • Technical Project. Foundation of supporting construction of calcium container and maintenance platform around it located above the track no. 43 in Rybnik Power Plant
  • Installation of calcium transportation system in container V=500m3 in Rybnik Power Plant. Bearers and overpass posts
1997
  • Technical Project. Reinforcement of ash container located in dispatch station of unit 8 in Rybnik Power Plant
  • Technical Project. Disassembly and demolition of buildings surrounding reactor IOS-6 in Rybnik Power Plant
  • Executive Project. Modernization of flue block casing in units no. 1 and 2 in Rybnik Power Plant
  • Constructional Project. Parking lot for passenger cars, a new reception and car scales in the area of an inner road in Rybnik Power Plant
  • Technological Project. Platforms of measuring spots installed on hot air pipe of flue gas desulphurization system in unit 1 in Rybnik Power Plant
  • Technological Project. Bearing construction of cable line in the area of flue gas desulphurization system in unit 1 in Rybnik Power Plant
  • Sealing of the walls of a water settler in Water Treatment Plant in Stodo³y, Rybnik
1995
  • Steel construction of boiler for Nettgau Span (Germany)